CONTAINERIZED BURNER FOR INCINERATING HAZARDOUS AND NON HAZARDOUS WASTES (BOTH DOMESTIC in Addition to INDUSTRIAL) AT A MINIMUM PRICE OF 300KG/HR WITH THE COMPLYING WITH REQUIREMENTS:
Ø PRIMARY CHAMBER VOLUME 7.2 M ³
Ø BURNING CAPACITY 300Kgs/hr.
Ø GAS DIESEL/NATURAL GAS; VARIETY OF PRIMARY BURNERS & & SCORE: 2 @ 250kw
Ø Assortment OF SECONDARY BURNERS & & RANKING: 2 @ 400kw; ELECTRIC SUPPLY 230V 60Hz
Ø CONTAINER TIPPER, MONITORING SYSTEM, CLEANSING SYSTEM
Ø GAS CLEANING AND ALSO GAS MONITORING.MSW1000 General Medical Waste Incinerators melt cost approximately 100kg/hr
03. The approximated liquid water waste – 6000 L including
Temporary alloted space for filtrations system- 30×× 20.
6. Guarantee period as well as maintaincne.
Ø CONTAINER TIPPER, MONITORING SYSTEM, CLEANSING SYSTEM
Ø GAS CLEANING AND ALSO GAS MONITORING.MSW1000 General Medical Waste Incinerators melt price approximately 100kg/hr
A2400 Animal/ fowl Waste Incinerators burn rate as much as 200kg/hr. Laboratory waste Management system
01. Liqued water filtration system.
02. Number of laboratories – 05
03. The approximated liquid water waste – 6000 L including
a. chemicals
b. contaminants
c. Bio Hazardous products.
Temporary alloted room for filtrations system- 30×× 20.
The following need to be indicating in the biding document.
1. Technique of getting rid of treated waste water.
2. Method of disposing of the sludge.
3. To comply with ISO standard/regulations of Central Environment Authority [CEA] 4. Period for building and construction.
5. Request the cost for every thing of the project [Consultancy/designing/construction] For the whole task.
6. Guarantee period as well as maintaincne.